大型燃煤锅炉电除尘器投运方式探讨 被引量:5

Study of electrostatic precipitator(ESP) operation mode for large capacity coal-fired boiler
下载PDF
导出
摘要 北仑发电厂通过对600 MW燃煤锅炉煤油混烧阶段投运电除尘器的不利影响和可行性进行分析,经现场试验和实际应用,实现了锅炉投煤粉后电除尘器的全程投运,大幅度地减少了烟尘排放量。 According to the manual provided by ESP manufactory for Beilun Thermal Power plant, it is forbidden to put ESP into operationWhen The oil guns are in operation during the start-up, shutdown and low load operation period of boiler. Consequently the fly ash and dusthad to be directly discharged to the atmosphere, so bringing about some negative influence on the environment. Beilun Power Plant analyzedthe negative influence and feasibility of operating ESP in the stage of coal-oil mixing firing in the 600 MW coal-fired boiler. Through the onsite tests and practical application, Beilun Power Plant has realized the whole process operation of ESP after the boiler starts to fire pul-verized coal, with the fly ash and dust reduced substantially.
出处 《中国电力》 CSCD 北大核心 2004年第8期68-70,共3页 Electric Power
关键词 燃煤锅炉 煤油混烧 电除尘器 投运方式 coal-fired boiler coal-oil mixing firing electrostatic precipitator(ESP) operation mode
  • 相关文献

参考文献3

  • 1况延良.静电除尘器电场投运时间的确定[J].华东电力,1992,20(2):29-31. 被引量:4
  • 2林澄波 赵明 徐守清.电除尘安装、运行及维修[M].机械工业部电除尘器标准化技术委员会、国家重大技术装,1995..
  • 3.上海及望亭燃煤电厂300MW以上机组电除尘器现状调查科学技术报告[R].华东电力试验研究院,1997..

共引文献3

同被引文献4

引证文献5

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部