期刊文献+

集装箱结点站列车开行方案研究

Research on the Projects of Trains Operation in a Container Crunode Station
下载PDF
导出
摘要 各集装箱办理站产生的集装箱流向其邻近的结点站输送 ,可能采用不同的运输方案 .通过对不同运输方案的作业过程的分析 ,将整个运输过程产生的箱小时消耗按作业性质分解并分别计算 .比较不同方案下的箱小时消耗可知 ,方案一为消耗最少的运输方案 .同时分析各运输方案实施可行性 ,方案一对区间能力占用较大 ,方案二较为有利 .由此得出结论 :方案一可作为集装箱运输发展的方向 ,在目前的运输组织条件下 。 The container stream from container transaction stations is to be transported by varieties of trains to adjacent crunode stations. Operation processes in different transportation schemes are to be analyzed. The consumption of container-hours in Projects are to be decomposed and calculated according to processes of busywork. It can be drawn that consumption of project 1 is the most economic through comparing of consumption of container- hours of various projects. Feasibility of various projects is analyzed. Project 2 is more advantaged than project 1 in the view of engrossing carrying capacity of district. So the conclusion can be drawn that project 1 can be looked as the way container transportation development in future and project 2 is more advantaged currently.
作者 周勇
出处 《华东交通大学学报》 2004年第4期106-109,共4页 Journal of East China Jiaotong University
基金 西南交通大学科学研究基金项目 (2 0 0 3B0 7)
关键词 铁路运输 集装箱运输 结点站 列车开行方案 container transportation container crunode station project s of trains operation
  • 相关文献

参考文献3

  • 1[3]Williams R J. On the Queueing Networks in Heavy Traffic, Stochastic Networks: Theory and Applications[M] Clarendon Press, 1996.
  • 2[4]Cheng Changlin The Freight Routing Problem of Time-Definite Freight Delivery Common Carriers[J], Transportation Research Part B, 2001.7:525-547.
  • 3铁道部赴加拿大铁路集装箱考察组.加拿大铁路集装箱运输组织及货场管理[J].中国铁路,2002(6):44-46. 被引量:3

共引文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部