摘要 针对岭澳核电站2号机组1号循环水泵电动机(2CRF001MO)发生两相短路故障事件,采用RCA方法(根本原因分析)对相关系统设备进行了调查和试验,对可能存在的故障模式排查、论证和分析,指出了电动机匝间绝缘存在制造质量缺陷是此次事件的根本原因,并就今后如何提高电动机设备运行的可靠性提出了改进建议。 According to the two - phase short circuit fault occurred in the motor of No. 1 circulating cooling water pump of No. 2 U-nit in Ling Ao Nuclear Power Station, the investigation and tests using RCA method for related system and equipments are carried out, and the patterns for possible existent faults are checked, proved and analyzed. The paper points out that the prime cause of the fault is the quality defects of manufacturing in inter - turn insulation of motor, and presents the suggestions for improving the reliability of motor equipment operation in the future.
出处 《电力设备》 2004年第8期58-60,共3页 Electrical Equipment
关键词 电动机 定子绕组 短路 故障 分析 motor stator winding short circuit fault analysis
  • 相关文献

同被引文献2

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部