期刊文献+

煤矿主副井行车电控系统变频调速改造 被引量:1

Reform of frequency conversion of electrical apparatus control system to traveling cranes of main and auxiliary shafts of mine
下载PDF
导出
摘要 煤矿主副井行车位于井塔的最上层 ,在吊运重物时井架摇晃造成安全隐患。叙述了煤矿主副井行车原运行方式存在的问题 ,提出了变频改造方案及主回路系统图 。 The traveling cranes of main and auxiliary wells are located at the top of the tower in the coal mine .There will be some hidden trouble caused by the rumble-tumble of the rack of the well when we swing up the heavy. The paper introduces formerly questions about operational mod of travelling cranes of main and auxiliary wells, advances the frequency conversion reform,gives the system-map of the main-loop, generalizes the main design characteristic and effect after reform.
出处 《煤矿机械》 北大核心 2004年第9期117-118,共2页 Coal Mine Machinery
关键词 行车 变频改造 效果 travelling crane invertor reform effection
  • 相关文献

参考文献1

  • 1Blmal KBase.交流调速传动系统[M].重庆:重庆电机工程学会,1986..

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部