期刊文献+

西河水电站闸坝渗漏原因及加固灌浆处理效果评价

Reason for Seepage of Gate Dam of Xihe Hydroelectric Station and Assessment on Grouting Reinforcement Treatment
下载PDF
导出
摘要 西河水电站闸坝存在较为严重的库水渗漏问题。以西河水电站库水渗漏处理的全过程为例,分析了闸坝的地层、岩性、构造和水文地质条件,找到了渗漏发生的位置在左坝肩,其原因为存在溶蚀孔隙发育的顺河向透水灰岩条带,提出了渗漏处理的方案,并对灌浆处理前后的岩体的透水性进行了对比。对比资料表明:固结灌浆大幅度地降低了岩体的透水性,达到了加固岩体、减少库水渗漏的目的。 Considerable reservoir seepage occurs in Xihe hydropower station . According to treatment of Xihe hydropower station , strata , rocks , tectonics and hydrogeological condition at the gate dam is analyzed and seepage occurs on the left abutment and was caused by porous limestone zone along the river . A seepage treatment measure is provided and the permeability of rock mass is compared before and after grouting . The result indicates that the permeability of rock mass is decreased by consolidation grouting and rock mass is reinforced and reservoir seepage is reduced .
出处 《四川水力发电》 2004年第3期15-17,共3页 Sichuan Hydropower
关键词 西河水电站 闸坝 库水渗漏 固结灌浆 效果评价 Xihe hydroelectric station gate dam reservoir seepage consolidation grouting result assessment
  • 相关文献

参考文献2

二级参考文献3

共引文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部