摘要
以广东省东莞市虎门沙角电厂储灰坝圆筒堤抛石基础堵漏工程为例 ,分析大孔隙海岸抛石基础堵漏灌浆工程的特殊性 ,探讨合适有效的大孔隙。
Taking the project for the drum dam throwing stones foundation at Shajue power plant in the town of Humen in Dongguan Guangdong for example, this paper analyses the particularity of the plugging grouting project for the coast big pores throwing stone foundation, and probes into suitable and effectual method of plugging and grouting for big pores and caves.
出处
《西部探矿工程》
CAS
2004年第11期41-43,共3页
West-China Exploration Engineering
关键词
圆筒坝堤
堵漏方法
注浆
灌浆量
drum dam
plugging method
grouting
grouting amount