摘要
主要介绍宁靖盐高速公路X标段 (k1 38+ 0 0 0~k1 5 3+ 0 0 0 )工程地质概况、软基设计、施工方案以及沉降观测情况 ,选取了代表性的桥头 1 0m、桥头 5 0m、圆管涵、箱涵处作为沉降观测点进行软基的沉降观测 ,并对本段高速公路通车运营近两年的动态沉降观测资料进行了分析 ,得出了具有一定参考价值的结论 ,在此基础上对累计沉降量和沉降曲线进行研究 。
This paper briefly present that engineering geology summary, soft foundation ,the project of construction and settlement observation of the Xrd(k138+000~k153+000) contract section . It select some representative settlement observation point locations ,such as the distance 10m from the end of bridge , the distance 50m from the end of bridge ,pipe thrusting, trunk culvent. It analyze the dynamic settlement observation data of two years working after the highway is transported, some reference conclusions are put forward , on the basis of analysis ,the accumulated settlement and settlement curve is researched ,the result of soft foundation treatment is appraised.
出处
《盐城工学院学报(自然科学版)》
CAS
2004年第3期53-56,共4页
Journal of Yancheng Institute of Technology:Natural Science Edition
关键词
高速公路
软基处理
沉降观测
沉降分析
效果评价
soft foundation
settlement observation
settlement analysis
result appraisal