大跨径无支架缆索吊吊装系统设计与施工 被引量:19

Design and Construction of Long Span System with Non-standing Cable Hoists
下载PDF
导出
摘要 钱塘江四桥为双层桥面双主拱钢管混凝土组合系杆拱桥,主桥共11跨,包括下承、中承、上承式3种结构形式。上部结构的吊装采用两跨无支架缆索吊吊装施工,拱肋安装采用斜拉扣挂体系,技术含量高,施工难度大。 The 4th Qiantangjiang River Bridge in Hangzhou is a concrete-filled steel tubular composite tied arch bridge with double main arches.the main bridge is composed of 11 pans that include 3 types of structures in form of through arch,half-through arch and deck arch.The superconstruction adops two spans non-standing cable hoists to lifting and elevating,the steeltubular is fixed by adoping slanting and drawing cable.The technique content is very high and great difficulties have been overcome in the construction.
出处 《公路交通科技》 CAS CSCD 北大核心 2004年第9期74-77,共4页 Journal of Highway and Transportation Research and Development
关键词 钱塘江四桥 无支架缆索吊 扣索 钢管混凝土拱 塔架 The 4th Bridge over Qiantangjiang River non-standing cable hoists Cable stay Concrete-filled steel tubular composite tied arch bridge Tower shelf
  • 相关文献

参考文献2

  • 1[1]中华人民共和国交通部.公路桥涵施工技术规范(JTJ041-2000)[M].北京:人民交通出版社,2000.
  • 2[2]罗邦富,魏明钟,沈祖炎,陈明辉.钢结构设计手册(GBJ17-88)[M].北京:中国建筑工业出版社,1988.

同被引文献72

引证文献19

二级引证文献57

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部