摘要
针对日立250MW发电机定子线棒的焊接缺陷,采用红外技术检测对接头进行过热处理,取得了显著效果,该工艺为今后同类型发电机组出现类似缺陷提供借鉴。
After the over temperature problem of stator winding soldered joints in a 250 MW HITACHI made generator found by using infrared technology, the treatment of the joints is very successful. This can be used as an example for the similar problem of the same type generators.
出处
《河北电力技术》
2004年第4期18-20,共3页
Hebei Electric Power
关键词
发电机
定子
接头
缺陷处理
generator
stator
joints
defect treatment