摘要
简述了古交电厂26000m3单元组合式蓄水池的工程概况及防水施工顺序和工艺,着重介绍了防水措施中的止水带、防渗膜、密封膏、侧壁底部施工缝以及池壁对拉片等施工要点。
This paper introduces the general situation of the subsequence and t echnique of the waterproof construction of 26 000 m3 articulated unit impounding basin of Gujiao Power Plant, and introduces emphatically the construction point s such as the watertight band, impermeable membrane, sealed cream, side wall bot tom construction joint, and pond side para-pulling chip, etc.
出处
《科技情报开发与经济》
2004年第9期342-343,共2页
Sci-Tech Information Development & Economy
关键词
单元组合式矩形蓄水池
施工顺序
防水措施
古交电厂
articulated unit rectangle impounding basin
construction subsequen ce
waterproof countermeasure
Gujiao Power Plant