摘要
通过工程实例,对由于降水等原因造成的地基承载力降低,易产生不均匀沉降而进行的桩底后注浆技术作 了简要的介绍,并详细阐述了它的施工工艺。
Abrief introduction of the injection technology under pile is described in the paper based on an engineering project, about some reasons why the bear the weight of strength of foundation decreased and non-uniform settlement of foundation caused easily. And the procedure is given in detail .
出处
《洛阳工业高等专科学校学报》
2004年第3期27-28,共2页
Journal of Luoyang Technology College
关键词
桩底后注浆
承载力
不均匀沉降
Injection
Bearing the weight of strength
Non-uniform settlement