摘要
通过实例 ,对大型多层工业厂房爆破拆除的方案设计、参数确定及施工组织进行了翔实的介绍 ,提出了爆破此类建筑物时应注意的问题及对策 。
By analyzing a practical example,the author demonstrates how to design the imploding projects of demolishing large tier workshops, calculate the imploding parameters, and organize the field implement. The problems that should be paid attention to while imploding and demolishing such buildings and the countermeasures are pointed out.It has valuable reference to the implosion and demolishment of the similar complex structure.
出处
《建筑结构》
CSCD
北大核心
2004年第7期56-57,共2页
Building Structure
关键词
多层工业厂房
爆破拆除
施工组织设计
水压爆破
tier workshops
implosion
demolishment
parameters
field implement organizing