摘要
南水北调东线一期工程江苏境内 ,是以泵站为核心 ,泵站运行的可靠性是实现调水目标的前提和关键。因此 ,应将泵站的运行可靠性放在首位。鉴于目前贯流式机组的技术状况 。
The first-stage project of the eastern route of South-to-North Water Diversion lies in side of Jiangsu Province, of which the pumping station is the core. Because the operation reliability of pumping station is the premise and key point for the realization of water diversion objective, it should be placed in the forefront. In view of the technical status of tubular pumps, it should be carefully selected and used.
出处
《南水北调与水利科技》
CAS
CSCD
2004年第5期15-16,共2页
South-to-North Water Transfers and Water Science & Technology
关键词
南水北调
机组选用
探讨
South-to-North Water Diversion Project
select use of set
probing