摘要
公伯峡水电站工程在施工期建立了健全的环境保护管理体系,试行了环境监理制,各项环境保护措施得到了及时落实,施工期的环境污染和生态破坏得到了有效控制,使项目区环境状况得到了较大的改善。
The Gongboxia hydropower station set up a perfect management system of environmental protection during its construction period. And the environment supervision system has been tried out in order to implement timely the various environmental protection measures so that the environmental pollution and ecological disruption have been effectively controlled during its construction period and the environmental conditions have been greatly improved in the project area.ilar hydro
出处
《水力发电》
北大核心
2004年第8期16-18,共3页
Water Power
关键词
环境保护
污染防治
施工期
公伯峡水电站
environmental protection
pollution prevention
construction period
Gongboxia Hydropower Station