规范工程建设的档案管理 被引量:3

The norm file management constructs to provide the efficiently emollient guarantee for the engineering
下载PDF
导出
摘要 公伯峡水电站工程开工后,业主把档案工作纳入议事日程,成立信息管理中心,建立完善的档管理体系,理顺了文件资料的运转程序,明确了“岗位责任制”,确保机构、人员、设备“三落实”,并结合工程实际,制定了一系列管理制度,规范档案管理工作,为工程建设提供了高效有力的保障。 The file management is an important work within the distance construction of electrician of water, he since relate to the engineering to construct the realization of the target, and then relate to the engineering to finish construction to check before acceptance of circulate by going to the safety smoothly progress. So, work well the file management work, make it standardize, the norm turn, for the engineering constructs to provide in time and efficiently of service, is guarantee the engineering construction smoothly progress of important fact.
作者 许春珠
出处 《水力发电》 北大核心 2004年第8期19-19,共1页 Water Power
关键词 工程档案 档案管理 公伯峡水电站 engineering file the file management the Gongboxia Hydropower Station
  • 相关文献

同被引文献7

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部