摘要
在黄河上游水电有限责任公司建设公司的大力支持和帮助下,大坝面板表面止水GB填料挤出机的研制工作获得成功,并且应用于公伯峡水电站面板堆石坝施工中。该技术填补了GB材料机械化施工的空白,解决了长期以来困扰工程技术人员的难题,取代了人工填充GB材料,解决了面板表面止水施工时,施工人员投入多、坡面材料堆放困难、工作效率低下、施工技术和施工质量难以保证的技术难题。
Yellow river Upstream Hydropower Development Co.,Ltd., to support strongly and help in the yellow river upper stream water electricity under, the big dam front panel surface the water GB filler extrudes the machine to research to manufacture the work to stand in The Gongboxia Hydropower station Concrete Face Rockfill Dam up achieve success, and apply in under construction. That technique fills up the material of GB to mechanize the blank of the construction, solving to perplex the engineering technical personnel's hard nut to crack for long time, replacing the artificial to fill the material of GB, solving the front panel surface the water construction, start construction personnel devotion many, the slope faces the material heap to put the difficulty, the work efficiency is lowly, construction technique and construction quantity hard assurance of technique hard nut to crack.
出处
《水力发电》
北大核心
2004年第8期25-27,共3页
Water Power
关键词
混凝土面板堆石坝
表面止水
GB填料
挤出机
公伯峡水电站
Concrete face rockfill dam
surface water stop
filler of GB
extrude the machine
Gongboxia hydropower station