公伯峡水电站厂房工程工期压缩后的施工技术保障

Construction technical assurance of powerhouse works for Gongboxia Hydropower Station after its construction period reduction
下载PDF
导出
摘要 公伯峡水电站厂房混凝土工程由于种种原因要求施工工期大大缩短。为确保提前发电工期目标的实现,在对原施工计划、技术措施、资源配置进行认真分析研究的基础上,重新规划了技术措施,调整了施工进度计划。在业主、设计、监理和施工四方的积极配合下,保证了2004年2台机组投产发电目标的实现。 The concrete project of powerhouse for Gongboxia Hydropower Station demands to compress greatly in time limit for a project for various reasons. Therefore, based on serious analysis and research on the original construction plan and technical measures and resources allocation, we reprogrammed the technical measures and adjust the plan of construction schedule in order that we could assure the target of generating electricity ahead of schedule.With the active cooperation among Employer, Designer, Engineer and Constructor, we have assured of realizing the target of two sets of generator putting into production.!
出处 《水力发电》 北大核心 2004年第8期46-47,50,共3页 Water Power
关键词 厂房工程 工期 技术保障 公伯峡水电站 powerhouse project construction period technical guarantee Gongboxia Hydropower Station
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部