摘要
公伯峡水电站发电厂房工程的施工质量管理采用强化质量意识,健全制度,落实质量责任,技术措施先行,资源投入到位,严格工艺作风,强化现场控制等措施;通过全体职工的努力,工程施工质量一直保持在较高的水平。
The management of construction quality of the powerhouse of Gongboxia Hydropower Station adopted the following measures: strengthening the awareness of quality, perfecting the system, implementing the responsibility of quality, carrying out technical measures in advance, inputting enough resources, fulfilling strictly techniques, and increasing the field control. With the concerted effort of all the workers, the high quality of the project has been gained.
出处
《水力发电》
北大核心
2004年第8期63-64,共2页
Water Power
关键词
质量管理
发电厂房工程
公伯峡水电站
quality management
powerhouse
Gongboxia Hydropower Station