摘要
针对公路路基工程集中厂拌生产、供应混凝土施工管理所遇到的问题 ,从前后台施工与组织、技术质量管理、成本控制等方面进行探讨 ,提出了应采取的措施。
In connection with problems of mixing concrete integratedly in factory of road bed project during productive & supply periods,it discusses up-and-down stage construction & organization, control of techtonical quality and cost control as well as adoptable measures are propounded.
出处
《山西建筑》
2004年第19期88-89,共2页
Shanxi Architecture
关键词
混凝土
集中厂拌
路基工程
施工管理
concrete, mixing concrete integratedly in factory, road bed project, constructive management