期刊文献+

一种工作流时间截止期限的动态验证方法 被引量:8

Method for dynamic verification of activity deadlines in timed workflow
下载PDF
导出
摘要 为了动态验证工作流中活动实例的截止期限,提出了一种基于关键路径进行动态验证的方法。该方法根据工作流图中选择分支和可跨越活动的选取情况,将工作流图分别描述成Ebf图、Ebs图、Ewf图和Ews图,并求得各图中的Ebf,Ebs,Ewf和Ews关键路径;根据当前时间和所得到的关键路径对后续活动的截止期限进行了动态验证。这种方法不必计算所有活动实例的截止期限,只需根据实际需要,针对指定的后续活动实例进行截止期限的动态验证,从而减少了计算量,提高了工作流的执行效率。 To verify deadlines of activity instances within workflow, a method of dynamic verification was proposed based on the critical path. According to the choices of the different branches and the optional activities of workflow, the workflow graph was transformed to Ebf, Ebs, Ewf and Ews graphs. Subsequently, the critical paths of the Ebf, Ebs, Ewf and Ews graphs were worked out respectively. The deadlines of the activity instances that would be executed later were verified from the current time and the critical paths. By utilizing this method, it is unnecessary to calculate the deadlines of all the activity instances in actual execution, and it reduces the computational quantity and improves the efficiency of executing workflow.
作者 唐达 刘丹妮
出处 《计算机集成制造系统》 EI CSCD 北大核心 2004年第9期1154-1159,共6页 Computer Integrated Manufacturing Systems
关键词 截止期限 关键路径 工作流 deadline critical path workflow
  • 相关文献

参考文献8

  • 1李建强,范玉顺.工作流模型时间有界性验证与分析研究[J].计算机集成制造系统-CIMS,2002,8(10):770-775. 被引量:20
  • 2EDER J, PANAGOS E, POZEWAUNIG H, et al. Time management in workflow systemsm[A]. Proceedings of the 3rd International Conference on Business Information Systems[C]. Berlin,Germany:Springer-Verlag,1999.265-280.
  • 3MARJANOVIC O. Dynamic verification of temporal constraints in production workflows[A]. Proceedings of the 11th Australian Database Conference[C]. New York,WA,USA:IEEE Press,2000. 74770-77581.
  • 4EDER J, PANAGOS E, RABINOVICH M. Time constraints in workflow systems[A]. Proceedings of the 11th Conference on Advanced Information Systems Engineering[C]. 1999.1-14.
  • 5李慧芳,范玉顺.工作流系统时间管理[J].软件学报,2002,13(8):1552-1558. 被引量:48
  • 6SON J H,KIM M H. Improving the performance of time-constrained workflow processing[J]. Journal of Systems and Software, 2001,58:211-219.
  • 7SON J H, KIM J H, KIM M H. Deadline allocation in a time-constrained workflow[J]. International Journal of Cooperative Information Systems, 2001,10(4):509-530.
  • 8李红臣,史美林,陈信祥.工作流系统中的业务过程描述及分析[J].计算机研究与发展,2001,38(7):798-804. 被引量:54

二级参考文献8

共引文献114

同被引文献76

引证文献8

二级引证文献29

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部