期刊文献+

核设备制造中的不符合项控制 被引量:1

Non-conformity Control in Nuclear Equipment Manufacturing
下载PDF
导出
摘要 不符合项控制对顺利完成核设备制造至关重要。本文以东方锅炉(集团)股份有限公司在广东岭澳核电站2×1000MW电功率压水堆核岛主设备分包制造中的不符合项控制实践为例,阐述了核设备制造中不符合项的控制原则和处理程序等,供从事我国核设备制造行业质量保证工作的有关人员参考。 Non-Conformity Control is very important for the successfully manufacturing of nuclear equipment. Taking the non-conformity control in the manufacturing of the nuclear island main components for Guangdong Ling抋o Nuclear Power Station (2×1000MW PWR) by Dongfang Boiler Group Co. Ltd. as an example, this paper expounds the principles and procedures of the non-conformity control in nuclear equipment manufacturing. It can provide a reference for the concerned personnel engaged in the quality assurance in the nuclear equipment manufacturing industry in China.
作者 刘建成
出处 《核动力工程》 EI CAS CSCD 北大核心 2004年第5期478-480,共3页 Nuclear Power Engineering
关键词 核设备制造 不符合项 控制 Nuclear equipment manufacturing,Non-conformity,Control
  • 相关文献

同被引文献9

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部