摘要
铁路客运专线接触网工程工艺与普速铁路工艺相差较大 ,笔者结合客运专线概算编制的经验 ,对一些特殊的工艺进行了分析 ,希望对相关项目的概算编制工作具有借鉴作用。
The techniques of overhead contact system works of passenger dedicated line are far different from that of ordinary speed railway. Combined with experiences in budgetary estimate system of passenger transport specialty, the author gives special analysis on some of the specific techniques and hopes to provide a reference for the budgetary estimate system of relevant projects.
出处
《铁路工程造价管理》
2004年第5期29-30,共2页
Railway Engineering Cost Management
关键词
客运专线
接触网工程
技术经济
分析
Passenger dedicated line, Overhead contact system works, Techno-economy, Analysis