期刊文献+

安康黄石滩水库溢洪道设计方案比较分析

Comparison and analysis of alternatives of spillway schemes for Huanglongtan, Ankang
下载PDF
导出
摘要 黄石滩水库施工过程中,由于施工安排、工程资金等问题,造成溢洪道未按时开工,为满足防汛要求,建设单位在垭口开挖了临时泄水通道,造成溢洪道轴线变更的既成事实。为节约工程投资,维持库区环境整体协调,设计进行了方案比较,通过技术、经济、合理性分析,确定了经济、可行的溢洪道实施方案。 Because of construction arrangement and financing problems, the spillway was not start building on time during construction of Huanglongtan Reservoir. In order to meet the need of flood prevention requirement, the constructer excavated a temporary discharge channel, which resulted in that the spillway had to change axes. For the sake of money saving, according to maintain environment of reservoir area harmonious, based on comparison of design schemes and analysis social and economic rationality of the schemes, the implementation scheme was determined.
作者 楚艳春 CHU Yan-chun (Shaanxi Institute of Water Resources and Electric Power Investigation and Design MWR, Shaanxi Xi'an 710001, China)
出处 《西北水力发电》 2004年第3期48-50,共3页 Journal of Northwest Hydroelectric Power
关键词 溢洪道 方案比较 经济性 可行性 spillway comparison of alternatives economic rationality feasibility
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部