摘要
分析了汛期交口渠首渭河洪峰流量的预报过程,并对汛期洪峰流量预报提出了新的设想和建议。
The process of the flood peak flow forecast of jiaokou head work in flood season was analyzed in this paper, and the new methods and suggests for the flood peak flow forecast in flood season were put forward.
作者
王晓霞
WANG Xiao-xia (Shaanxi jiaokou chouwei irrigation, Shaanxi Weinan 714000, China)
出处
《西北水力发电》
2004年第3期62-64,共3页
Journal of Northwest Hydroelectric Power
关键词
汛期
洪峰流量
预报
flood season
flood peak flow
forecast