摘要
针对华能南通电厂一期2台350MW机组汽轮机部件固体颗粒侵蚀问题,分析腐蚀原因,提出检修和运行操作上采取的措施,并对二期汽轮机通流部分设计进行改进。
In view of the solid particle erosion problems on the components of two350MW steam turbines in Huaneng Nantong Power Plant1st phase,the erosion causes were analyzed,the preventive measures in repair and operation were put forward,and the design of flow passages of steam turbines in the2nd phase was improved.
出处
《中国电力》
CSCD
北大核心
2003年第6期45-47,共3页
Electric Power
关键词
汽轮机
固体颗粒侵蚀
防范措施
设计改进
steam turbine
solid particle erosion
preventive measures
design improvement