摘要
型钢悬挑外脚手架高45m,双排,采用14#工字钢做悬挑支架.悬挑支架总长2.5m,向外挑出1.43m,内段臂长1.07m.挑架外端部焊接14mm圆钢拉杆,拉杆拉在上框架梁内,拉杆中间采用花篮螺栓紧固;挑架内端部采用Ω型圆钢锚固筋固定在楼板上.锚固筋在浇筑楼板混凝土时预埋在楼板筋下,安装工字钢支架时,将工字钢穿进锚固筋吊环内,就位后将锚固筋吊环上部间隙用钢筋头填实,并焊接牢固.在工字钢挑架头部及间距1.1m处分别(脚手架立杆位置上)焊20mm钢管或圆钢,高50mm.在脚手架上部8层、12层分别加设14mm圆钢卸载拉杆,拉杆与脚手架拉结,拉杆中间采用花篮螺栓紧固.除挑架及卸载拉杆外,另每层用6.5mm圆钢设置拉结筋,拉结筋预埋在框架梁内,间距为5~6m.卸载拉杆及拉结筋均拉设在脚手架横竖钢管结点处.
Structural steel hanging scaffold is 45 m high, double rowed, and chooses 14#double T iron as hanging stand. The hanging stand is 2.5 m long, pushes outside with 1.43 m, and its inner arm is 1.07 m long. Its outside end is welded with a 14 round steel pole and fixed with screw; its inside end is fixed with Ωtype round steel anchor bolt. The anchoring steel is pre layed under the floor board. When installing the double T iron stand, put the T iron through the hanging ring of the anchor, fill the rest space in the ring with steel heads, and then weld them stably; weld respectively 20 mm with 50 mm high steel pipe or round steel between the head of the stand with space length 1.1 m(the location of the stand pole); from the upper on the eighth and the twelfth layer, add respectively 14 round steel loading pole linked with the scaffold and fixed with screw. Besides the hanging stand and the loading pole, add 6.5 round steel on each layer as lacing bar which is pre layed in the frame bridge with space length 5~6 m.Both the loading pole and lacing bar are set on the joints of the horizontal and vertical steel pipes.
出处
《宁夏工程技术》
CAS
2003年第4期374-376,共3页
Ningxia Engineering Technology
关键词
型钢悬挑支架
卸荷拉杆
锚固筋吊环
拉结筋
structural steel hanging stand
loading pole
anchoring steel ring
lacing bar