摘要
Parallel proeessing presents a new opportunity and challenge for the analvsis and computation of large-scale power systemproblems. It can largely shorten the computation tirae of the power systems reliability evaluation and provide powerful suppnrt to realize its on-line applieation. This paper deseribes the hasic concept of composite generation and transmission system reliability evaluation anddetails the prineiple of various Moute-Carlo simulation methods, it also introduces a topology for parallel processing based on coarse grainasynchronous implementation and analyzes its prineiple. Finally. this paper introduces the method to realize the communieation between themaster and slave processor based on TCP/IP.
出处
《中国电力》
CSCD
北大核心
2003年第11期23-23,共1页
Electric Power