合肥CBD中央广场建筑不设温度缝的技术措施 被引量:4

Technical Measures Applied in the Large Acreage Concrete of Central Palaza in CBD of Hefei City
下载PDF
导出
摘要 合肥CBD中央广场工程为一大底盘多塔楼建筑 ,若按常规方法施工 ,则必须按《混凝土结构设计规范》要求预留伸缩缝。但伸缩缝的留设会影响建筑物的使用功能。根据计算分析结果 ,在采取多项技术措施的前提下 ,取消了伸缩缝 。 The central plaza in Hefei CBD have 5 towers on the podium. The longitudinal and cross length of the podium is about 119 5m and 81 1m respectively. With the common construction method, the expansion joint should be preformed according to the concrete design code. The existance of the expansion joint cannot satisfy operating requirement.Several technical measures, in response to the results of the analysis, are introduced to eliminate the expansion joint and the discrepancy between the usage and design code.
出处 《建筑结构》 CSCD 北大核心 2004年第8期16-19,共4页 Building Structure
关键词 温度应力 收缩 预应力 大面积混凝土 后浇带 混凝土结构 temperature stress shrinkage prestressed large acreage concrete foundation expansion joint
  • 相关文献

参考文献2

二级参考文献6

共引文献34

同被引文献11

引证文献4

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部