摘要
介绍柳州市阳和大桥主桥在设计中,根据自然条件、施工条件、经济性和工期要求,对桥型所进行的多方案比选,并在施工时,根据现场实际情况的改变及时进行设计调整。充分体现了桥梁设计是一个动态的设计过程。
This paper presents the comparison and selection of bridge types of the main bridge of Yanghe Bridge in Liuzhou at design stage in accordance with the Bridge site natural conditions, construction conditions, economy and time schedule requirements, and timely adjustment of the design with the varied conditions at the site during construction. The selection and adjustment in question amply demonstrates that bridge design is always a dynamic process of design.
出处
《世界桥梁》
2004年第3期15-17,共3页
World Bridges
关键词
阳和大桥
预应力混凝土桥
连续粱
箱形梁
桥梁设计
施工方案
prestressed concrete bridge
continuous girder
box girder
bridge design
construction scheme