摘要
对某办公大楼人工挖孔桩桩基事故原因进行了分析,并就采取的加固措施进行了对比说明。
The accident cause for a cast-in-situ pile foundation by manual excavation in an office building was analyzed, and the reinforcement measures taken were compared and described.
关键词
桩基
事故分析
事故处理
办公大楼
cast-in-situ pile by manual excavation
bearing capacity of single pile
pebble bed
pile foundation treatment