摘要 啤酒废水经酸化预处理后进入人工湿地.床体中充填适量石灰石,起到了调节pH值和提高氧化还原电位(ORP)的作用.在进水12h,排水12h,水力停留时间(HRT)4d的条件下,面积负荷2511kgCOD/ha·d,有效容积负荷0 22kgCOD/m3·d,大大超出了系统的处理能力;而面积负荷1080kgCOD/ha·d,有效容积负荷0 092kgCOD/m3·d,系统出水COD浓度小于100mg/L.进水6h,排水6h,HRT2d,周期处理水量不变,面积负荷2160kgCOD/ha·d,有效容积负荷0 184kgCOD/m3·d,系统出水COD浓度小于100mg/L.结果表明,间歇流方式进出水,可以最大程度地利用床体上层的大气复氧,缓解了水生植物根系放氧不足的矛盾;适当缩短间歇流周期,可以提高系统处理废水的能力. Constructed wetland received pre-acidified brewery wastewater.Appropriate amount of limestone filled in bed played the role of adjusting pH value and raising redox potential.Under the condition of 12h fill,12h withdrawing and hydraulic retention time (HRT) of 4 days,the capacity of system was exceeded greatly at area loading rate of 2511kgCOD/ha.d and efficient volume loading rate of 0.22kgCOD/m^3.d.But effluent achieved less than 100mg/L of COD concentration at area loading rate of 1080kgCOD/ha.d and efficient volume loading rate of 0.092kgCOD/m^3.d.Under the condition of 6h fill,6h withdrawing and HRT of 2 days,keeping constant amount of wastewater during one period,effluent achieved less than 100mg/L of COD concentration at area loading rate of 2160kgCOD/ha.d and efficient volume loading rate of 0.184kgCOD/m^3.d.The results showed that input and output by the way of tides flow utilized atmosphere reaeration at a large degree,compensating the inadequacy of releasing oxygen of aquatic roots,and appropriate shorter period of batch flow improved the capacity of system.
出处 《吉林建筑工程学院学报》 CAS 2004年第3期4-6,共3页 Journal of Jilin Architectural and Civil Engineering
基金 吉林省环保局项目〔吉环科字第00-11号〕
关键词 潮汐流人工湿地 废水处理 容积负荷 面积负荷 PH值 ORP batch flow constructed wetlands wastewater treatment area loading rate volume loading rate pH value ORP
  • 相关文献

参考文献3

  • 1[1]Sherwood C.Reed,Donald Brown.Subsurface flow wetlands-A performance evaluation.Water Environment Research,1995,67(2):244-248.
  • 2[2]Reed S.C.,Middle Brooks E.J. and Crites R.W.Natural System for Waste Management and Treatment.2ndedition.MaGraw-Hill.New York,USA,1988:164-220.
  • 3张甲耀,夏盛林,熊凯,金显春.潜流型人工湿地污水处理系统的研究[J].环境科学,1998,19(4):36-39. 被引量:36

二级参考文献1

共引文献35

同被引文献150

引证文献11

二级引证文献90

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部