期刊文献+

人工湿地植物系统优化管理研究 被引量:25

Optimization and Utilization of Constructed Wetland Plant Systems
下载PDF
导出
摘要 在北京官厅水库附近建立潜流人工湿地(总面积:5×20m×2m),芦苇、蒲草混合种植,研究其工艺参数对植物生长状况的影响,植物生长优劣及杂草的存在对污染物去除效率的影响。结果表明,人工湿地运行初期控制水位和水力负荷对植物生长非常重要;在相同的水力负荷下,植物生长状况良好的人工湿地污水处理效果明显高于植物生长状况差的人工湿地,污染物去除效率与植物生长的优劣呈正相关关系;大量杂草特别是浅根旱生杂草的生长会降低人工湿地的净化效率。最后分析了人工湿地生态,提出系统植物的种植、运行期和冬季的管理方法和综合利用思路。 Intercropped with Phragmites communis and Typha angustifolia, subsu rface flow constructed wetland systems(CWS) with the surface area of 5×20 m×2 m were established beside Guanting Reservoir, an important source of Beijing. U sing parallel experiment on the spot, the influence of operation parameters on t he growth of plants, and the influence of the growth status of plants and weeds on the removal of pollutants were studied. The results showed that it was import ant to control water level and hydraulic loading at the beginning of the constru cted wetland systems start-up. Under the same hydraulic loading, the wetland w ith better growing plants had higher pollutants removal efficiency than that wit h relatively worse growing plants, and the pollutants removal efficiency was cor related to the growth status of plants. The presence of large quantities of weed s, especially those shallow-rooted xeric weeds, reduced the removal of contami nants in the wetland. In order to improve the utilizing efficiency of artificial wetland, we also studied the artificial ecological chain of wetland system, the state of the plant diseases, insect pests and the amount and quality of the pla nt, discussed the measures for plant cultivating and controlling and for prevent ing and curing plant diseases and insect pests in artificial wetland, and put fo rward the thought of integrative optimization and utilizing the systematic plant .
出处 《农业环境科学学报》 CAS CSCD 北大核心 2004年第5期1003-1008,共6页 Journal of Agro-Environment Science
基金 国家重点科技攻关计划项目(96-920-40-04)
关键词 人工湿地 芦苇 蒲草 植物系统 constructed wetland Phragmites communis Typha angustifolia pla nt systems
  • 相关文献

参考文献15

  • 1[1]House CH.Combining constructed wetlands and aquatic and soilfilter for reclamation and reuse of water[J].Ecol Eng,1999,12:27-38.
  • 2[2]Brix H.Use of constructed wetland in water pollution control: Historical development, present status, and future perspectives[J].Wat Sci Tech, 1994,30(8): 209-223.
  • 3籍国东,孙铁珩,李顺.人工湿地及其在工业废水处理中的应用[J].应用生态学报,2002,13(2):224-228. 被引量:213
  • 4朱彤,许振成,胡康萍,马桂花,李华.人工湿地污水处理系统应用研究[J].环境科学研究,1991,4(5):17-22. 被引量:153
  • 5[5]TennesseeValley Authority.1990.River basin operations water resources, destruction of constructed wetlands for treatment of municipal wastewater, monitory report for the period: March 1998 to October 1989: 5.
  • 6[7]Drizo A, Frost C A, Grace J.Physico chemical screening of phosphate removing substrates for use in constructed wetland systems[J].Wat Res, 1999,33(7): 3595-3602.
  • 7[8]高拯民.城市污水土地处理技术设计 [M].北京:中国标准出版社, 1991.
  • 8[9]孙铁珩,周思毅. 城市污水土地处理技术设计 [M].北京:环境科学出版社, 1997.
  • 9[10]Brij G. Natural and constructed wetlands for wastewater treatment: potentials and problems [J].Wat Sci Tech, 1999,40(3): 27-35.
  • 10白晓慧,王宝贞,余敏,聂梅生.人工湿地污水处理技术及其发展应用[J].哈尔滨建筑大学学报,1999,32(6):88-92. 被引量:309

二级参考文献68

共引文献748

同被引文献362

引证文献25

二级引证文献285

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部