沙牌碾压混凝土高拱坝施工技术与质量控制 被引量:1

Construction technology and quality control for Shapai RCC Arch Dam
下载PDF
导出
摘要  沙牌大坝施工采用全断面通仓簿层连续上升施工工艺,在碾压混凝土施工过程中采取了真空溜管、诱导缝、有盖重与无盖重固结(接触)灌浆相结合、改性混凝土、高抗裂材料等施工工艺方法.完工后在坝体取出的碾压混凝土芯样最长达13 2m,芯样表面光滑,集料分布均匀,层间结合良好,施工质量优良. The application of thin-later full-section and full-surface area placement technology in Shapai RCC Dam is described in this article. During construction, vacuum chuting, induced joints, consolidation(contact) grouting with and without cover weight, improved concrete, high anti-cracking materials and other quality control methods were used. The RCC samples of 13.2 m length each, obtained after completion of the placement, have demonstrated smooth surface, well-distributed aggregate, good contact surfaces and high construction quality.
出处 《水利水电技术》 CSCD 北大核心 2004年第10期31-34,共4页 Water Resources and Hydropower Engineering
关键词 全断面碾压 施工技术 质量控制 沙牌碾压混凝土拱坝 full-section Construction construction technology quality control Shapai RCC Arch Dam
  • 相关文献

同被引文献1

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部