摘要
本文介绍了秦山核电厂核测系统在装料前后、零功率和功率试验阶段的调试过程、方法和主要数据以及源量程、中间量程和功率量程之间的复盖情况。最后对将来核测系统的设计提出了几点建议。
This paper describes the commissioning process, method and maintest results of ex-core neutron instrumentation system during fuel loading) low power test and power test, and overlap of source, intermediate and power range neutron instrumentation. It provides suggestions for future design improvement of ex-core neutron instrument system.