摘要
本文介绍秦山核电厂首次装料程序、装料中的核安全与核监测,以及装料试验用的临时核测仪表和设备。首次装料试验结果表明,仔细筹划、充分准备是装料试验成功的基础,试验结果满足验收准则。
The initial core loading program, nuclear safety and nuclear monitoring during the core loading and temporary instrumentation system for Qinshan NPP is described. The initial core loading test indicated that overall planning and careful preparing before loading test is basic to success this test. Test results agreed with acceptance criteria.
出处
《核动力工程》
EI
CAS
CSCD
北大核心
1993年第1期64-68,共5页
Nuclear Power Engineering
关键词
燃料组件
核电站
秦山
辐射防护
Qinshan Nuclear Power Plant
Initial core loading
Nuclear safety
Neutron counting equipment