期刊文献+

中小型土坝坝面排水系统的设计 被引量:2

Design of Drainage System in Medium and Small Dam Face
下载PDF
导出
摘要 一般中小型土坝工程缺乏当地的高频率常遇洪水的自记雨量降雨强度资料 ,因此 ,无法以满足工程精度要求的设计径流量来设计坝面的排水系统。首次提出了一种可操作性强的简便方法 ,通过计算表格和 5年一遇 10min降雨强度等值线图及 6 0min降雨强度转换系数等值线图 ,可快捷地计算坝面排水的设计径流量 ,进而确定坝面排水系统的断面尺寸 。 In general medium and small scale earth dam project, due to lack of self-recording precipitation intensity data on local high (frequency) floods, there will be no way to have the designed runoff which can meet the project accuracy necessity for the design of dam face drainage system. A kind of strong operational simple method was put forward fist in this article. By means of using calculating table and 10 minutes precipitation intensity contour map in 5-year return periods and 60 minutes precipitation intensity transfer (coefficient) contour map, the designed runoff for the dam face drainage system can be calculated quickly and the cross section dimension of dam face drainage system can be confirmed as well as the design of dam face drainage system in more detail can be made.
出处 《水利水电工程设计》 2004年第3期6-9,54,共4页 Design of Water Resources & Hydroelectric Engineering
关键词 坝面排水系统 降雨强度 设计径流量 断面尺寸 等值线图 design of dam face drainage system, precipitation intensity, designed runoff, designed cross section dimension.
  • 相关文献

参考文献1

  • 1姚祖康.JTJ018-97公路排水设计规范[M].北京:北京交通出版社,1998..

同被引文献4

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部