期刊文献+

基于UML的业务流程模型分析方法研究 被引量:9

The Analysis Method of UML-based Business Process Model
下载PDF
导出
摘要 基于UML的业务流程建模方法是业务流程建模领域中的一种重要方法,该文对基于UML的业务流程建模方法中的重要工具活动图进行形式化定义,给出了基于活动图的业务流程模型与工作流网之间的规范化转换方法,从而可以分析和检验基于UML的业务流程模型的静态和动态属性。 UML-based business process modeling is one of the most important methods in business process modeling.This work gives the formal definition of activity diagrams ,one of the most important tools in UML-based business process modeling.And the formal transformation between activity diagrams and workflow nets is proposed.Then the structural and dynamic properties of UML-based business process models can be analyzed with the support of Petri Nets theory.
出处 《计算机工程与应用》 CSCD 北大核心 2004年第29期226-228,共3页 Computer Engineering and Applications
关键词 业务流程建模 UML PETRI网 活动图 business process modeling,UML ,Petri Nets,activity diagrams
  • 相关文献

参考文献14

  • 1Loos Peter,Allweyer Thomas. Object-Orientation in Business Process Modeling through Applying Event Driven Process Chains(EPC )in UML[C].In:Enterprise Distributed Object Computing Workshop 1998,1998:102~112
  • 2Chang Y L,Chen S et al.Workflow Process Definition and their Applications in e-Commerce[C].In:International Symposium on Multimedia Software engineering 2000,2000:193~200
  • 3Gou H M,Huang B Q et al. Modeling Distributed Business Process of Virtual enterprises Based on the Object-Oriented Approach and Petri Nets[C].In:2001 IEEE International Conference on Systems,Man and Cybernetic, 2001-03: 2052~2057
  • 4Selmin Nurcan,Georges Grosz,Carine Souveyet. Describing Business Processes with a Guided Use Case Approach[C].In:Proceedings of CAiSE'98,1998: 339~362
  • 5Martin Schader,Axel Korthaus. Modeling Business Process as Part of the BOOSTER Approach to Business Object-Oriented System Development Based on UML[C].In:Enterprise Distributed Object Computing Workshop 1998,1998:56~67
  • 6OMG Unified Modeling Language Specification[S].http://www.omg.com, 2001
  • 7C Petri.Kommunikation mit Automaten[D].University of Bonn,Bonn:1962
  • 8W M P van der Aalst,A H M ter Hofstede. Verification of Workflow Task Structures:A Petri-net-based Approach[J].Information Systems,2000;25(1 ) ,43~69
  • 9http://www .daimi.au.dk/designCPN/
  • 10http://www.di.unito.it/~greatspn/

同被引文献56

引证文献9

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部