全过程监控大木桥路车站深基坑施工

Monitoring and Control of the Whole Construction Process in the Deep Foundation Excavation of Damuqiao Road Subway Station
下载PDF
导出
摘要 在地铁车站深基坑施工中,运用"时空效应"理论,对施工全过程监控,将基坑施工全过程按施工工序予以分解,进行分阶段全面控制,达到控制变形保护周边环境的目的。 Making use of the 'space-time effect' principal, the whole construction process was monitored and controlled during the excavation of deep foundation pit of a subway station. The whole construction process is decomposed into several sub-processes according to the construction procedure. The objective of protecting the surrounding environment was achieved by strictly controlling the deformation of the shoring system for each sub-process.
作者 黄天寅
出处 《施工技术》 CAS 北大核心 2004年第10期6-7,共2页 Construction Technology
关键词 地铁车站 深基坑 时空效应 全过程监控 控制变形 subway station deep foundation pit space-time effect whole construction process monitoring deformation control
  • 相关文献

参考文献1

  • 1SZ-08-2000.上海地铁基坑工程施工规程[S].[S].上海市市政工程管理局,..

共引文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部