给定人员情况下最小化开发时间和成本的软件项目调度 被引量:1

Scheduling software projects to minimize development time and cost with a given staff
下载PDF
导出
摘要 给出了一种软件项目的随机调度模型.它明确地把调度策略作为输入,一旦调度策略确定,模型就可以输出关于项目的完成时间或成本的一个概率分布.利用随机最优化技术,能够计算出软件项目的一个调度策略,它使得项目在人员给定的情况下开发时间和成本最小. A probabilistic scheduling model for software projects is presented. The model explicitly takes a scheduling strategy as input. When the scheduling strategy is fixed, the model outputs a pro-(bability ) distribution for the project completion time or cost. By the stochastic optimization techniques, schedules for software projects minimizing the development time or cost with a given staff can be computed.
出处 《海军工程大学学报》 CAS 2004年第5期52-55,共4页 Journal of Naval University of Engineering
关键词 过程建模 动态规划 最优化 软件过程 process modeling dynamic programming optimization software process
  • 相关文献

参考文献3

  • 1[1]Bertsekas B. Dynamic Programming and Optimal Control [M]. MA: Athena Scientific, 1995.
  • 2[2]Padberg F. A Stochastic Scheduling Model for Software Projects [R]. Dagstuhl Seminar on Scheduling in Computer and Manufacturing Systems, 2002.
  • 3[3]Padberg F. Towards optimizing the schedule of software projects with respect to development time and cost [A].International Software Process Simulation Modeling Workshop [C]. Prosim: APSEC, 2002.

同被引文献4

引证文献1

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部