摘要
融合前期的研究成果,对苏北灌河口口门沙咀成因进行分析.波浪沿岸输沙的结果表明,年平均净输沙方向为东南至西北,输沙量为3×10~4m^3/a,波浪沿岸输沙引起的沙咀沉积速率为0.5cm/a.从而对沙咀的成因提出了新的解释.并用数学模型计算了沙咀治理方案的各种流场.
This paper presents some results of the entrance bar study of Guanhe estuary through geographical and hydrological approches.New proofs of sediment transport and deposition characters have been obtained through the interpretation of remote-sensed pictures and analysis of columnar section.Based on numerical simulations of current and wave fields,calculations of sediment transport by tidal current and wave induced longshore current have been carried out.The results obtained by geographical and hydrological studies synthesized,an explanation for the formation and evolution of the entrance bar is pressented.Furthermore,preliminary plans for harnessing the waterway to the sea are discussed.
出处
《河海大学学报(自然科学版)》
CAS
CSCD
1993年第4期29-37,共9页
Journal of Hohai University(Natural Sciences)
基金
国家自然科学基金
关键词
灌河口
沉积
潮流输沙
成因
Guanhe estuary
entrance bar
estuary sediment deposition
sediment transport by tides
wave induced longshore sediment movement