摘要
南宁永和大桥主桥沉井基础施工在深基坑中进行,该基坑在设计和施工中受制约因素多、难度大,主要介绍该基坑的工程设计及施工技术。
The construction of the open caisson foundation of the main bridge of Yonghe Bridge in Nanning was carried out in deep foundation pit. The design and construction of the foundation pit are restrained by numerous factors and are rather difficult. In this paper, the design and construction techniques for the pit are mainly described.
出处
《桥梁建设》
EI
CSCD
北大核心
2004年第5期57-59,66,共4页
Bridge Construction
关键词
桥梁基础
沉井
基坑
边坡
防护
施工
bridge foundation
open caisson
foundation pit
side slope
protection
construction