摘要
大型和特大型水电工程建设项目规模宏大,对施工企业技术水平、管理能力和装备能力要求较高。小湾水电站四三联营体承揽右岸缆机基础及1000m以上坝基开挖、支护及相关工程施工。联营体通过“建章立制”、合理配置设备资源、实行动态优化管理提高了设备效能,降低了工程项目成本,探索了一种联营体设备管理模式。
The large scale and extraordinary-large scale hydropower projects require high technical level, high management capacity and high erection capacity. The Hydropower Project Four-Three Joint Venture for Xiaowan Hydropower Station has undertaken the construction of the foundation of right-bank crane and dam foundation excavation, support and corresponding works for more than 1000 m dam foundation. This paper describes the management mode of equipment resources for a joint venture by expounding formulation of rules and regulations, rational disposition of equipment resources, raising of the two efficiencies and reducing construction cost in running the joint venture.
出处
《水力发电》
北大核心
2004年第10期65-66,71,共3页
Water Power
关键词
施工机械设备
管理
降低成本
联营体
施工企业
construction equipment
management
cost reduction
joint venture
construction enterprise