摘要 在小湾左岸高缆基础拱桥施工中首次对板拱施工的脚手钢管排架进行了安全监测,得到了理想的变形和杆件应变时程曲线。监测中提出了各变形和应变测点在各施工工序的理论分析限制值,将监测结果与之进行比较和综合分析,进而决策是否报警。成果表明,监测与理论分析基本一致。 The safety monitoring on the scaffold steel-tube shaft was firstly made in the construction of high cable foundation of arch bridge on Xiaowan left bank and the ideal deformation and the strain history curve of bar elements. In the monitoring, the theoretical analysis limitations of each deformation and strain key point in different construction procedures were put forward. The monitoring results and theoretical limitations were compared and analyzed and then that alarm is given or not was decided. The results showed that the monitoring results are basically consistent with theoretical analysis limitations.
出处 《水力发电》 北大核心 2004年第10期79-81,共3页 Water Power
关键词 安全监测 拱桥 缆机 施工 小湾水电站 safety monitoring arch bridge cable machine construction Xiaowan Hydropower Station
  • 相关文献

参考文献8

二级参考文献22

  • 1秦权.随机有限元及其进展──Ⅰ.随机场的离散和反应矩的计算[J].工程力学,1994,11(4):1-10. 被引量:46
  • 2秦权.随机有限元及其进展──Ⅱ.可靠度随机有限元和随机有限元的应用[J].工程力学,1995,12(1):1-9. 被引量:15
  • 3Norden E, Huang Zhengshen, Steven R Long, et al. The empirical mode decomposition and the Hilbert spectrum for nonlinear and non-stationary time series analysis. Proc Royal Society of London Series, 1998,454:903 - 995.
  • 4Montesinos M E, Munoz-Cobo J L, Perez C. Hilbert Huang analysis of BWR neutron detector signals: application to DR calculation and to corrupted signal analysis. Annals of Nuclear Energy, 2003,30 : 715 - 727.
  • 5史家钧,同济大学学报,1997年,25卷,增刊,71页
  • 6张启伟,同济大学学报,1997年,25卷,增刊,76页
  • 7郑绍,JTJ023-85公路钢筋混凝土及预应力混凝土桥涵设计规范,1989年
  • 8Qin Q,Review of literature on application of reliability theory to bridge engineering,,1999年
  • 9Qin Q,SantaBarbara.USA,1998年,945页
  • 10刘春华,计算结构力学及其应用,1998年,15卷,2期,232页

共引文献400

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部