摘要
通过对唐山矿业分公司井下高压供电系统状况及事故的分析,找出影响高压供电的主要原因,提出预防井下高压供电事故的措施。
By analyzing the status and accidents of underground high-voltage power distribution system of Tangshan Mining Branch Company, the main causes that influence on high-voltage power supply are found out and the measures of preventing underground high-voltage power supply accidents are put forward.
出处
《煤矿机电》
北大核心
2004年第5期79-80,共2页
Colliery Mechanical & Electrical Technology
关键词
地下开采
高压供电
预防与措施
underground mining
high-voltage power supply
prevention and measures