燃煤发电机组整套启动调试是机组投产前的一个重要阶段,是设计、制造、安装、调试、运行质量的综合体现。介绍了330MW燃煤发电机组整套启动调试的情况和过程,对同类机组的启动调试具有借鉴意义。
The starting commissioning of coal-fired generating sets is the critical part of their commissioning.It is the integrated quality inspection of the design,the manufacturing,the installation and the pre-commissioning of the generating sets.In this article,the process of starting commissioning of 330 MW coal-fired generating sets was introduced.It provided a reference for other generating sets of the same type.