摘要
本文主要介绍了如何利用制冷机组的蒸发器冷负荷和冷凝器热负荷之间的热平衡来设计大型冷水机组性能测试台 ,以减少试验设备初投资。
In this article,a way to design the test equipment of large water chillers is discussed,based on the heat equilibrium between the evaporator absorbing and the condenser emitting,so as to decrease the equipment investment and save test expenses.
出处
《制冷》
2004年第3期62-64,共3页
Refrigeration
关键词
热平衡
螺杆机组
冷却塔
名义工况
节能
Heat equilibrium,Screw chiller,Cooling tower,Nominal working conditions,Energy-saving