摘要
解决教育建筑赶工矛盾,应重点抓以总控网络进度计划为龙头,落实以下保证措施1、管理体系落实,预控管理到位;2、以总控部署为时限,落实检查、纠偏;3、按总控各阶段需要,落实人、材、机。
To solve the problem of getting educational building constructed quickly, network planning of schedule for general control of construction is the key point and the following safeguard measures should be carried out. I. To carry out management system and get preliminary control management done.II. To regard disposition of general control as deadline to rectify the deviation.III. To arrange personnel, materials and machines according to the requirements for each phase of general control.
出处
《福建建筑》
2004年第5期9-10,81,共3页
Fujian Architecture & Construction
关键词
监理
进度计划
进度控制
Supervision, schedule plan, schedule control