以总控网络计划为龙头,解决赶工矛盾——大学城医大新校区一期工程的监理体会

General Control Network Planning as Head to Appease the Contradiction of Getting Work Done Quickly——Supervision Perception about the Phase I Construction of New Campus of Medical University in University Town
下载PDF
导出
摘要 解决教育建筑赶工矛盾,应重点抓以总控网络进度计划为龙头,落实以下保证措施1、管理体系落实,预控管理到位;2、以总控部署为时限,落实检查、纠偏;3、按总控各阶段需要,落实人、材、机。 To solve the problem of getting educational building constructed quickly, network planning of schedule for general control of construction is the key point and the following safeguard measures should be carried out. I. To carry out management system and get preliminary control management done.II. To regard disposition of general control as deadline to rectify the deviation.III. To arrange personnel, materials and machines according to the requirements for each phase of general control.
作者 苏中强
出处 《福建建筑》 2004年第5期9-10,81,共3页 Fujian Architecture & Construction
关键词 监理 进度计划 进度控制 Supervision, schedule plan, schedule control
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部