摘要
介绍新建的马钢二钢高速线材情况,并针对二钢高速材车间精整区域部分设备存在的问题,进行系统的分析,进而提出有效的技术性完善整改措施,并组织实施。
In this article, the overview of high speed wire rolling in No. 2 Steelmaking Plant of Ma' anshan Iron and Steel Co, . Ltd. is presented and the systemic analysis, in terms of problems relevant to some equipment in the finishing area of high speed wire rolling workshop of this plant, is conducted. Effective renovating measures for technical perfection are produced and put into operation. And renovating effects are distinct.