摘要
探讨SRT-Ⅲ型裂解炉改造中新增超高压蒸汽管线的安装与运行对原有管线的影响,及HOTTAP类管线与常规热力管线的计算工况差别,并提出此类管线应用CAESARⅡ软件进行应力分析的思路与方法。
The article discusses the influence of assembling and running of the new super high pressure steam pipeline on the old pipeline in SRT - Ⅲ cracking furnace, and points the difference of calculation between HOT TAP piping and general piping, then proposes the thoughts and methods of using CAESAR II to calculate such pipeline.
出处
《石油化工设计》
CAS
2004年第2期10-13,共4页
Petrochemical Design
关键词
蒸汽管线
配管
裂解炉
乙烯
生产装置
技术改造
Super high pressure Steam Piping HOT TAP Stress analysis Thermal expansion