基于拉格朗日松弛法的优化调度系统 被引量:13

A GENERATION RESOURCE SCHEDULING SYSTEM BASED ON LAGRANGIAN RELAXATION APPROACH
下载PDF
导出
摘要 介绍了一个采用B/W/D(Web Browser/Web Server/Database Server)三层体系结构的电力资源优化调度系统的设计与实现。该系统是以拉格朗日松弛法框架为核心。用户可以通过Internet建立调度案例,输入或上载调度信息和机组信息;之后,系统执行调度程序,完成优化调度计算,将调度结果以各种方式进行汇总统计、分析,并以图形和报表等多种形式显示给用户。该系统可以辅助发电公司制定日常生产计划,并可用于电力市场中的成本利润分析、辅助决策等。系统具有客户端零安装、升级维护方便等特点。 The design and implementation of a generation resource scheduling system with applying B/W/D (Web Browser/Web Server/Database Server) three-tier structure is presented. This system is based on the Lagrangian relaxation approach. User can create a scheduling case by Internet, and input or upload the Information of scheduling and generators. Then the system executes scheduling program to get the optimal solution, analyzes the results, and presents with various graphs or report forms. This system can help generation companies lay a course of production, analyze the profils, and make the bidding decision in electricity mar礴t. The system has the characteristics of zero-installation on client side, so the system is convenient to be maintained and upgraded.
出处 《电力系统自动化》 EI CSCD 北大核心 2004年第18期76-79,共4页 Automation of Electric Power Systems
基金 国家杰出青年基金资助项目(6970025) 国家自然科学基金重点资助项目(59937150) 国家863计划资助项目(2001AA413910)。~~
关键词 电力系统 拉格朗日松弛法 资源调度 B/W/D结构 power systems Lagrangian relaxation approach resource scheduling B/W/D structure
  • 相关文献

参考文献8

  • 1Grimes R C, Jabbour S J. The Dynamics Model for Measuring Dynamic Operating Benefits. Technical Report, Decision Focus Incorporated. Los Altos (CA), 1989
  • 2Cohen A, Sherkat V. Optimization Based Methods for Operations Scheduling. Proceedings of IEEE, 1987, 75 (12):1574-1591
  • 3Guan X, Luh P B, Yan H. An Optimization-based Method for Unit Commitment. International Journal of Electric Power & Energy Systems, 1992, 14(1): 9-17
  • 4Guan X, Luh P B, Yan H, et al. Optimization-based Scheduling of Hydrothermal Power Systems with Pumped-storage Units.IEEE Trans on Power Systems, 1994, 9(2): 1023-1031
  • 5Fan W, Guan X, Zhai Q. A New Method for Unit Commitment with Ramping Constraints. Electric Power Systems Research,2002, 63(3): 215-224
  • 6Zhai Q, Guan X, Cui J. Unit Commitment with Identical Units:Successive Subproblem Solving Method Based on Lagrangian Relaxation. IEEE Trans on Power Systems, 2002, 17(4): 1250-1257
  • 7Wang S J, Shahidehpour S M, Kirschen D S, et al. Short-term Generation Scheduling with Transmission and Environmental Constraints Using an Augmented Lagrangian Relaxation. IEEE Trans on Power Systems, 1995, 10(3): 1294~1301
  • 8范炜,管晓宏.具有状态约束的动态系统优化调度方法及其应用[J].电力系统自动化,2002,26(13):38-42. 被引量:7

二级参考文献6

  • 1[1]Bard J F. Short-term Scheduling of the Thermal-electric Generators Using Lagrangian Relation. Operations Research, 1988, 36 (5): 756~766
  • 2[2]Ferreira L A F M, Andersson T, Imparato C F, et al. Short-term Resource Scheduling in Multi-area Hydrothermal Power Systems. Electric Power & Energy Systems, 1989, 11(3): 200~212
  • 3[3]Bannister C H, Kaye R J. A Rapid Method for Optimization of Linear Systems with Storage. Operations Research, 1991, 39(2): 220~232
  • 4[4]Guan X, Luh P B, Yan H, et al. An Optimization-based Method for Unit Commitment. Electric Power & Energy Systems, 1992, 14(1): 9~17
  • 5[5]Svoboda A J, Tseng C L, Li C, et al. Short-term Resource Scheduling with Ramp Constraints. IEEE Trans on Power Systems, 1997, 12(1): 77~83
  • 6[6]Kazarlis S A, Bakirtzis A G, Petridis V. A Genetic Algorithm Solution to the Unit Commitment Problem. IEEE Trans on Power Systems, 1996, 11(1): 83~92

共引文献6

同被引文献102

引证文献13

二级引证文献87

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部